This 224 m segment, as part of the broader project, not only reduces the travel distance by mitigating steep gradients but also avoids ðšð¯ð¨ð¢ðð¬ ðð¡ðž ð§ðžðžð ðŸð¨ð« ðš ð¬ððžðžð© ðœð®ððð¢ð§ð ð°ð¢ðð¡ ðš ð¡ð¢ð¥ð¥ ð¬ð¥ð¨ð©ðž ðšð§ð ð¥ðž ðžð±ðœðžðžðð¢ð§ð ðŸ–🎠ððžð ð«ðžðžð¬, the minister said on X (formerly Twitter).The viaduct, built at a cost of Rs 12 crore, will facilitate the smooth flow of vehicles, bypassing the challenging terrain of Sherebibi area gradients.The project can also contribute to the region's economic growth ðšð§ð ðžð§ð¡ðšð§ðœðžð¬ ð¢ðð¬ ð¨ð¯ðžð«ðšð¥ð¥ ðœð¨ð§ð§ðžðœðð¢ð¯ð¢ðð², the minister added.---IANSpannu/dpb(Disclaimer: This post has been auto published from IANS news agency without any modification to the text and has not been reviewed by editor)